Since last Tuesday I've been on assignment at Sandhill, helping my old community construct a 12,000 gallon cistern. While it's gratifying to know that I can still do the physical work, lifting and setting concrete blocks for eight hours the past three days has been exhausting. I've been easing out of bed each morning, not jumping.

Still, the work is going well. After having done a few of these projects (I've previously built two septic tanks and one cistern using a poured slab floor, block walls, and a poured roof) you learn mistakes to avoid and better methods of production, and this project has gone more smoothly than any I've done before.

1. Dig a big hole. More than enough to be able to walk around the work on the outside, the excavation needs to be able to accommodate the possibility of cave-ins without disastrous delays or necessitating that work will need to be redone. In this instance, the footprint of the cistern is 27' x 8.5', so we had the backhoe dig a hole 43' x 25'. (It's a bit eerie to be working in a nine-foot hole where you can see strawberries blooming above your head on the edge of the undisturbed garden—kind of a mole's eye view.)

2. That said, you need a tight enough hole that you can get a cement truck close enough to drop the concrete for the floor (with a minimum of chasing wet concrete by hand—talk about work), yet without running the risk of the truck collapsing the soil under its approach and sliding into the pit. (I've never seen a cement truck tip over with a load on, but I'm sure it isn't pretty—most especially when it ends up in your backyard.)

3. Much of the art of construction is learning when you need to be picky and when you don't. There are certain errors, such as the levelness of the floor or the squareness of the walls, where being a half inch off over 25 feet can haunt you the remainder of the project. Others, such as a sideways curve in a slab form or a crack in a concrete block don't matter a hoot.

My crew is young and eager, yet inexperienced working with concrete and block. Thus, when they see a slightly damaged block they ask me whether it's usable or not. Experience allows me to think ahead to how the block will be stressed and what it will take to overcome the defect. If a block is chipped, can it be hidden by placing it next to a pilaster; how much surface boding will it take to smooth over the hole? I can see ahead to make these assessments, and they haven't a clue. 

It is worthwhile to be very precise about the placement of 90-degree angled rebar when the slab is being poured, such that the portion that extends vertically out of the slab will fit nicely into the cavities of the concrete block. If it hits the webbing of a block it's a bitch. Because I'm invariably too busy during a pour to attend to rebar placement (I'm usually running the screed board), I've learned that I have to set up a simple system that can be done right by someone who has never poured concrete before. I finally figured one out and all the bars were placed correctly. Hurray!

As the only experienced block layer in my crew, I insisted on placing every one of the 52 blocks used in the bottom course in a cement-rich mortar bed to correct any issues in the levelness of the slab. If there was going to be a problem with how level the walls were, I wanted it to be my fault, rather than falling on the shoulders of someone who was laying block for the first time. This care paid off in the smoothness with which we were able to lay up the succeeding courses. Sometimes you need to go slow for a time, so that you can go faster later.

After seven days on the job, I am enjoying a day off (and so is my back). In fact, that's why I have the time and energy to post this blog entry. I week from today I leave for two weeks on the East Coast and my goal is to have the walls completed and ready for backfilling before I board the eastbound Southwest Chief June 3. As of today the walls are half up (seven courses of block have been laid and grouted, with seven more to go).

If we can avoid a serious cave in for another fours days, we should be golden. Then I can form up and pour the roof when I return, when no one will be holding there breath during a heavy rain.

I enjoy projects like this:
o  Unlike most of my group dynamics work, it's clear at the end of the day that you've accomplished something. (With group work, progress can be subtle.)

o  I enjoy working with my hands and using my body. (Or at least I used to. Every year it gets harder to lift full bags of cement, or maintain a spring in my step while schlepping buckets of grout.)

o  After 40 years of homestead living, I've learned quite a bit about working with concrete, block, brick, & tile, and it's a joy to put that knowledge to use. Even though I no longer do all the heavy lifting, I can still teach the techniques and lay out the work.

o  It's satisfying to pass along practical experience to an interested younger generation. I've received a good bit of this kind of mentoring over the years and it's time to pay some of it back.

It's amusing to realize that these days I'm the oldest block, whose health is most chipped—and yet I'm the one who's relied upon to determine whether chipped blocks are still serviceable. There's a symmetry about it that's pleasing to me.

Wednesday, October 26, 2011

When I'm 62

Three weeks ago I was over at Dancing Rabbit for a free concert by the local blues band that had been rehearsing for months to provide the musical accompaniment for the Off Grid Blues weekend slated for Oct 7-9. The building in which the event took place was the Casa de Cultura, erected in the record time of four months, and this was to be its inaugural event.

Mostly the audience was sitting on the floor (to maximize space for dancing), but as I was settling in along the east wall, someone came up to me and whispered discreetly, "We've reserved a chair for you along the opposite wall." My first reaction was, "Huh?" Why would I get a chair when there were only three available and we were expecting a crowd of more than 30? Then I got it—I'm one of the old folks. The combined population of the tri-communities (Sandhill Farm, Dancing Rabbit, and Red Earth) is about 80, but there are only a handful of us geezers in the over-60 crowd, and the gesture with the chair was meant as a respect-your-elders kindness.

Yesterday I turned 62—which doesn't feel nearly as old as I used to think it was. Last week I noted how tired and achy I was after finishing a food processing shift (canning last-of-the-season tomatoes and pepper relish) and wondered about whether this was what people referred to when lamenting the dark side of getting older. But then I realized I'd been in the kitchen nonstop for 10 hours, working straight through lunch and dinner, and I figured pretty much anyone would enjoy sitting down after that.

During a birthday breakfast that Ma'ikwe and I cooked together for a group of friends yesterday morning, I was asked to speculate on the greatest impact another year would have on my life. Without a moment's hesitation, I replied, "Priority boarding on Amtrak." At the larger stations (such as Chicago and DC), there is a preliminary call for seniors and passengers traveling with small children. I've now reached the age where I'm officially a senior by Amtrak's lights, allowing me to henceforth avoid the cattle calls for boarding. Yippee! (As this courtesy is extended to all traveling in my party, this is also a significant benefit for my 41-year-old wife whenever we travel together—which is a lot.)

The Leaning Tower of Paris
I spent the night before my birthday over at Ma'ikwe's, and together with her 14-year-old son, Jibran (who is homeschooled), we devoted an entertaining hour to perusing a copy of E D Hirsch's Cultural Literacy. Among other things, this book contains an alphabetical list of 5000 names, phrases, dates, and concepts that the author considers essential for what every American needs to know if you want to be literate. While the edition was published in 1987 (and therefore doesn't include anything that has risen to the standard of being essential in the last quarter century—such as, say, the internet), I was interested in seeing how well Jiban's free-grazing reading habits were preparing him for understanding what Hirsch felt was important. (Also, secretly, I was interested in learning how literate his mother and I were.)

For the most part, all three of us knew most of the 153
terms we considered (whew). There were, however, some interesting gaps in our knowledge, as well as some hilarious brain farts. On whim, we started with the letter P, proceeding from "Pacific Islands" to "phallic symbol" (which was hard to top for its potential for comic relief with a 14-year-old boy). Perhaps the best moment came when I read "Paris" (the city, not the Greek myth) and Ma'ikwe immediately blurted out, "The place with the leaning tower!" complete with waving hands, a la a palm tree swaying in the breeze. Jibran fell to the floor struggling for breath, he was laughing so hard. I was impressed that he understood at once his mother's gaffe.

All and all I had a great day yesterday. Following my power breakfast (with fried potatoes, scones, portobello mushrooms, crustless quiche, and fresh coffee), I was serenaded with a round of Happy Birthday at lunch (replete with four homemade beeswax candles—one for every 15.5 years—glowing atop a pair of flourless chocolate cakes with maple icing), got in a three-mile walk, shipped a couple Priority Mail boxes, read a handwritten birthday letter from Annie (yes, the Post Office still delivers those), answered my email, stowed a couple dozen pints of preserves on the shelves of our root cellar, took a happy-birthday call from my daughter Jo, bought some train tickets, cleaned and filled a five-gallon bucket with fresh sorghum for the neighbors, and worked a five-hour boiler shift (from 4 pm to cleanup)
down at Sugar Shack (where we were cooking this season's penultimate batch of sorghum)—which afforded me the perfect occasion to enjoy a maduro-wrapped birthday cigar and a couple fingers of bonded Old Fitzgerald. While I stoked the fire, the bourbon stoked me. All of that and I still had time for about eight hands of bridge and an IPA before bedtime. How good can it get?

While my version of the good life is perhaps a little different from Scott & Helen Nearing's, it's plenty good enough for me.

Tuesday, July 19, 2011

A Chip from the Old Block

Sandhill Farm is a rural homestead. Naturally enough, over the course of living here 37 years, I've gradually picked up an eclectic set of self-sufficiency skills. In addition to the basic C's: cooking, cleaning, and childcare—which all members take turns at—I do some specialty C's here: canning, currant wine, and cutting up carcasses (when it's butchering time).

Stretching the alliteration for all its worth, it turns out that I have developed some expertise at a handful of exotic C's also: canoeing, contract bridge, and consensus training—though none are particularly called for when it comes to chasing chickens, cultivating carrots, corralling cows, churning cream, cutting corner posts, chopping clover, curing cucumbers, crushing cane, or caring for compost.

We learned early on in our country tenure that homestead husbandry means figuring out how to do for ourselves as much as possible, and hiring out as little as we can get away with. Thus, after more than three decades, I've learned how to be proficient at house wiring, I know my way around most woodworking tools, and I'm one of the heavy hitters when it comes to either filling mason jars or filling the need for a mason.

It's this last skill I want to comment on today. Since laying the concrete block foundation for a 16'x30' house extension our first summer, I've come to enjoy all manner of cementitious construction
(perhaps because it starts with the right letters). Everything from pouring concrete slabs to laying brick hearths; from assembling refractory ovens to decorative tile work.If there's cement involved, I dabble in it.

Last week I spent three days over at Dancing Rabbit, working on Ma'ikwe's cistern (which, auspiciously, begins with C). This project was started in a rush 15 months ago, but got stalled out abruptly when rain precipitated cave-ins after only three days on the job, and before we could get the walls completed. It wasn't just dead in the water—as recently as a month ago it was dead under the water, by virtue of a wet spring. Finally, last week that we had enough dry weather, a stout enough sump pump, and a suitable forecast to go back.

It was time to chip in again and help with the old block work. After having a local backhoe operator re-excavate the hole (I can only shudder at how many hours it would have taken to remove all that clay by hand), we started hauling out all the blocks (about 100) that had not been grouted in place before the collapse, in order to clean off the mud. With a scoop shovel and buckets we removed most of the dirty water that was pooled on the cistern floor. As if packing blocks uphill wasn't challenge enough, you had to be very careful where you stepped because the clay residue made the cistern floor as slicker than bog scum (they don't call clay and water mixtures "slip" for nothing).

Twenty hours later
(spread out over three days), we'd finished laying up the walls (12 courses of 44 blocks each) to within one course of the top and had grouted everything half way. Whew! That was the good news. Unfortunately, it's also July—April of last year is not only a distant memory for its temperamental rain forecasts, it's also a distant memory for its temperate thermometer readings. I mean it's hot in that pit, and my 61-year-old body has been feeling it!

While I arrived at Sandhill as a 24-year-old, I was more of a Young Buck—eager to try anything and with sufficient stamina to handle heavy labor all day long and still joke about it over a beer at the end of the day. Now however, I'm the Old Block that chips have steadily been taken from, and I can't do as much as I used to. Saturday we placed nearly 300 blocks, and at 35 lb a lift, they added up. By 4 pm I was plum tuckered out. After walking home, I was dismayed to discover a heat rash on my ankles from wearing the same socks three days running (the throbbing itch of my ankles was masked by the sunburn on my neck). I was so tired that I couldn't eat solid food at dinner, and settled for several glasses of milk and a bed time slightly ahead of the chickens—after a soothing cold shower and the therapeutic topical application of aloe vera lotion on my neck and ankles. Ahh!

After a couple days off (for Sandhill's regular Sunday meeting, my weekly child care shift, and a cooking day Monday) our cistern crew is back at it today. If all goes well we'll complete the surface bonding of the walls by Thursday, after which it'll be safe to backfill. We'll still have the roof to build (a tricky barrel vault that will be poured in place), but we'll be beyond any danger from cave-ins.

As I type, this Old Block is happy. I can still chip in on construction projects (though my accumulated knowledge is now surely more valuable than my stamina); I still enjoy working with blocks (maybe this goes all the way back to childhood, not just to that first block wall in 1974); and it's gratifying that my body has bounced back from the exhaustion of Saturday afternoon. After two days of yoga, steady hydration, and unfettered air flow on the stressed skin of my ankles and neck, and I'm ready for three more days in the pit. Yeehah!

With any luck, Ma'ikwe will have cold running water this winter—one more of those good things that begin with C.