Putting a Lid on It

Colloquially, advising some to "put a lid on it" translates into a request to shut up, or shut down. Well, yesterday that's exactly what I did.

In this case, I was shutting up Sandhill's new 12,000 gallon cistern, which involved pouring 4.75 cubic yards of concrete. The trickiest part was getting the forming right over a rectangular hole that was approximately 8'x25', so that the concrete went where we wanted it—and stayed there while it cured. As that amount of wet concrete weighs something north of a ton, you don't even want to think about the mess we'd have had if the forms had failed and the concrete slumped into the cistern. "Dismay"is not even in the same solar system as the emotional response that would have ensued. Although I had configured the shoring entirely with wood—something I was doing for the first time—everything held and the pour went smoothly (if you don't count Sandhill's pet kitten who mistakenly thought it would be clever to jump onto the wet concrete, and who realized immediately that something was very wrong).

Afterwards, the driver of the concrete truck (Dennis) admitted that he was worried about the forming holding up to the task. As there is no end of the amateurs buying ready-mix for backyard projects, you have to assume that drivers see just about everything, and Dennis had been delivering concrete for at least a decade. When he complimented us on the stoutness of our forming, I knew it was because he was not originally confident that we knew what we were doing. And so, in turn, I complimented him on keeping that opinion to himself until we were done. Whew.

While there is still be a good bit of work left before we can start capturing rain from the roof, the hard parts are now done and that was the bulk of my assignment. In the days ahead I'll oversee the wiring and the installation of the submersible pump, and advise on how to handle the overflow and the best way to connect the guttering to the cistern intake, yet these oddments are relatively straight forward and it feels good to have honored my commitment to build Sandhill a cistern—something I promised to do when I left the community last Thanksgiving.

Noticing how sore my back is today I'm wondering how much it makes sense to undertake this kind of work for anyone in the future. While it's never been easy for me to accept physical limitations—especially for things I used to be able to handle in stride—it's all the harder when I feel my knowledge about how to do things and my understanding of good technique have never been greater. Nonetheless, it may be time for me to put on lid on heavy construction. Sigh. 

Maybe in the future I can be the guy who rescues the mischievous kittens and redirects the ill-disciplined dogs. Kind of like a New Age Walmart greeter.

Sunday, June 1, 2014

Leading by Doing Less

As I reported two blogs ago (A Chip Off the Old Block), I'm immersed in constructing a 12,000-gal cistern for Sandhill these days, and we're entering a crucial phase where I'm trying to complete construction of the walls (14 courses of concrete blocks high) before it gets dark Monday.

There are two steps remaining, each of which takes a day: a) grouting courses 8-14; and b) surface bonding both the interior and exterior of the block walls. Once both of these are done, the cistern is safe against cave-ins and the excavation can be backfilled. I'll be departing for a two-week junket to VA & NC early Tuesday morning (during while I'll set down my persona as cementitious maestro and assume my other identity as process consultant/community networker) and I dare not place the project on pause for a fortnight unless its proof against cave-ins.

The grouting is slated for today and that's relatively straight forward. The crew has already been through this for courses 1-7 and they know the drill. Also, if we get some showers today (there's a 40% chance by this afternoon) it won't cause a problem. Grout is pretty soupy anyway and won't be appreciably affected by water tempering contributed by Mother Nature—unless we get a frog drowner.

The bigger worry is tomorrow. Surface bonding will take all day and can't be done in the rain. Unfortunately, Weather Underground says there's a whopping 60% chance of thunderbumpers at dawn Tuesday, with chances for rain gradually diminishing to 20% over the course of the day. Not good. But maybe we'll squeak by.

As the honcho of this project, the biggest difference for me from when I did a cistern for Ma'ikwe three years ago, is that my back can't take the heavy lifting as well, and my right knee is still somewhat gimpy from overextending it in Sept 2012. I still have all the knowledge needed to honcho; I just can't do as much of the work.

It used to be that I'd never ask someone to do things I wouldn't do myself, and I could basically teach construction by the monkey-see-monkey-do technique. With some things (for example, electrical wiring or wood carving) I can still do that. But when it comes to heavy construction I need to give way to stronger backs and more limber bodies. I don't like it, but it's silly to pretend otherwise. Now when someone on the crew offers to do more of the lifting, I accept.

I'm still tired at the end of the day, but I can get out of bed the day after when I don't indulge in sure-I-can-lift-that-bag-of-cement macho stupidity.

To be clear, I am still the one who:
o  Lays out the sequence of steps for the work.
o  Anticipates what equipment we'll need beforehand (so we can find ours, borrow a neighbor's, or buy one).
o  Determines acceptable quality standards for each phase—it's trickier than you think!
o  Explains why we do things the way we do. Occasionally a new person has an innovation that improves our work (its accuracy or efficiency) but mostly I'm explaining why the new idea is not going to work well.
o  Thinks ahead to how large the crew needs to be each day so the scheduler knows how many people to secure and for how long.
o  Orders the exotic materials that cannot be procured locally.
o  Manages what we can do in the rain, and what needs to be halted.


So it's not as if I've suddenly been put out to pasture. I just can't do everything any more, and am (reluctantly) learning to accept that, as well as embracing different ways of leading.

I tell you, this getting older stuff is not for sissies.

Tuesday, May 27, 2014

A Chip Off the Old Block

Since last Tuesday I've been on assignment at Sandhill, helping my old community construct a 12,000 gallon cistern. While it's gratifying to know that I can still do the physical work, lifting and setting concrete blocks for eight hours the past three days has been exhausting. I've been easing out of bed each morning, not jumping.

Still, the work is going well. After having done a few of these projects (I've previously built two septic tanks and one cistern using a poured slab floor, block walls, and a poured roof) you learn mistakes to avoid and better methods of production, and this project has gone more smoothly than any I've done before.

1. Dig a big hole. More than enough to be able to walk around the work on the outside, the excavation needs to be able to accommodate the possibility of cave-ins without disastrous delays or necessitating that work will need to be redone. In this instance, the footprint of the cistern is 27' x 8.5', so we had the backhoe dig a hole 43' x 25'. (It's a bit eerie to be working in a nine-foot hole where you can see strawberries blooming above your head on the edge of the undisturbed garden—kind of a mole's eye view.)

2. That said, you need a tight enough hole that you can get a cement truck close enough to drop the concrete for the floor (with a minimum of chasing wet concrete by hand—talk about work), yet without running the risk of the truck collapsing the soil under its approach and sliding into the pit. (I've never seen a cement truck tip over with a load on, but I'm sure it isn't pretty—most especially when it ends up in your backyard.)

3. Much of the art of construction is learning when you need to be picky and when you don't. There are certain errors, such as the levelness of the floor or the squareness of the walls, where being a half inch off over 25 feet can haunt you the remainder of the project. Others, such as a sideways curve in a slab form or a crack in a concrete block don't matter a hoot.

My crew is young and eager, yet inexperienced working with concrete and block. Thus, when they see a slightly damaged block they ask me whether it's usable or not. Experience allows me to think ahead to how the block will be stressed and what it will take to overcome the defect. If a block is chipped, can it be hidden by placing it next to a pilaster; how much surface boding will it take to smooth over the hole? I can see ahead to make these assessments, and they haven't a clue. 

It is worthwhile to be very precise about the placement of 90-degree angled rebar when the slab is being poured, such that the portion that extends vertically out of the slab will fit nicely into the cavities of the concrete block. If it hits the webbing of a block it's a bitch. Because I'm invariably too busy during a pour to attend to rebar placement (I'm usually running the screed board), I've learned that I have to set up a simple system that can be done right by someone who has never poured concrete before. I finally figured one out and all the bars were placed correctly. Hurray!

As the only experienced block layer in my crew, I insisted on placing every one of the 52 blocks used in the bottom course in a cement-rich mortar bed to correct any issues in the levelness of the slab. If there was going to be a problem with how level the walls were, I wanted it to be my fault, rather than falling on the shoulders of someone who was laying block for the first time. This care paid off in the smoothness with which we were able to lay up the succeeding courses. Sometimes you need to go slow for a time, so that you can go faster later.

After seven days on the job, I am enjoying a day off (and so is my back). In fact, that's why I have the time and energy to post this blog entry. I week from today I leave for two weeks on the East Coast and my goal is to have the walls completed and ready for backfilling before I board the eastbound Southwest Chief June 3. As of today the walls are half up (seven courses of block have been laid and grouted, with seven more to go).

If we can avoid a serious cave in for another fours days, we should be golden. Then I can form up and pour the roof when I return, when no one will be holding there breath during a heavy rain.

I enjoy projects like this:
o  Unlike most of my group dynamics work, it's clear at the end of the day that you've accomplished something. (With group work, progress can be subtle.)

o  I enjoy working with my hands and using my body. (Or at least I used to. Every year it gets harder to lift full bags of cement, or maintain a spring in my step while schlepping buckets of grout.)

o  After 40 years of homestead living, I've learned quite a bit about working with concrete, block, brick, & tile, and it's a joy to put that knowledge to use. Even though I no longer do all the heavy lifting, I can still teach the techniques and lay out the work.

o  It's satisfying to pass along practical experience to an interested younger generation. I've received a good bit of this kind of mentoring over the years and it's time to pay some of it back.

It's amusing to realize that these days I'm the oldest block, whose health is most chipped—and yet I'm the one who's relied upon to determine whether chipped blocks are still serviceable. There's a symmetry about it that's pleasing to me.

Monday, July 25, 2011

The Calm After the Storm

Continuing my recent construction saga, I had a perfectly lovely weekend not working on Ma'ikwe's cistern. After storming the work site for seven of the previous nine days, forced marches were no longer needed, and thus no blocks were lifted nor any cement bags opened the last three days.

Once the backhoe arrived to dig out the site July 14 (history buffs may note that we liberated the project from its clay incarceration on the 222nd anniversary of Bastille Day), we
pushed the pedal to the metal in an effort to complete our below grade work before there was another cave-in. This meant battling temperatures in the high 90s on a daily basis, yet we reached an important milestone last Friday afternoon when we completed surface bonding the walls—which makes them both watertight and strong enough to withstand backfilling.

Everyone on the crew was relieved that there would be no cistern work over the weekend, and it was interesting to note the release we felt when a thunderstorm rumbled into northeast Missouri Friday evening. Having weathered the storm of construction, we were uniquely poised to appreciate Nature's storm right afterward.

There was no question that our gardens and crops could use the water. After a wet spring we've received less than one inch of total precipitation this month, and nothing significant since a half-inch shower July 12 (
to say we're dry would be like noting that Roy Orbison could sing a little). Yet if the rain had arrived any earlier we would have been holding our collective breath about another collapse of the excavated walls—and the horror of starting over again.

So much of country living is about working with what the weather gives you. While it seemed we were fighting Nature by undertaking concrete work in the elevated heat indices of mid-July, we actually found the perfect 10-day window to complete a project that absolutely needed dryness. Whew!

There is something exquisitely sweet about a rain that arrives right after the hay is in the barn. Not only do you get to enjoy the immediate drop in temperatures, you also get to exhale the tensions you'd been carrying for days hoping that it wouldn't rain. The thing you'd been fearing is now suddenly transformed into a joy, as simply as excising the "h" from threat to yield treat.

It's the same for us each fall when we're trying to allow our sorghum crop (one third of Sandhill's income harvested in three week rush) maximum time to ripen, while not losing the crop through frost damage. We get the best yield if the seed is dead ripe, yet we're gambling marginal increases against the possibility of catastrophic loss if we're caught by the mercury dropping to 28 degrees or lower with the crop still standing. (A hard freeze bursts the cells walls of the cane and when temperatures rise again, the oxygen exposure can sour the juice beyond saleability within 24 hours.)

Every day we carefully interpret the tea leaves of the long-range weather forecast and make decisions about how long we dare wait before sending the campesinos out into the fields with machetes. When, finally, the crop is all in, there is a palpable relief that invariably accompanies the first hard freeze. With the sorghum in the barrel we're no longer vulnerable, and can appreciate how the frost puts our summer garden out of its misery, knocks back the flies, and signals the advent of the heating season (think cups of coffee with a good book sitting near the woodstove).

When you farm, you necessarily dance with the weather. However, as a partner, the weather is notoriously capricious, and it's nice to get through a whole play list now and then without any missteps or anyone cutting in.

Tuesday, July 19, 2011

A Chip from the Old Block

Sandhill Farm is a rural homestead. Naturally enough, over the course of living here 37 years, I've gradually picked up an eclectic set of self-sufficiency skills. In addition to the basic C's: cooking, cleaning, and childcare—which all members take turns at—I do some specialty C's here: canning, currant wine, and cutting up carcasses (when it's butchering time).

Stretching the alliteration for all its worth, it turns out that I have developed some expertise at a handful of exotic C's also: canoeing, contract bridge, and consensus training—though none are particularly called for when it comes to chasing chickens, cultivating carrots, corralling cows, churning cream, cutting corner posts, chopping clover, curing cucumbers, crushing cane, or caring for compost.

We learned early on in our country tenure that homestead husbandry means figuring out how to do for ourselves as much as possible, and hiring out as little as we can get away with. Thus, after more than three decades, I've learned how to be proficient at house wiring, I know my way around most woodworking tools, and I'm one of the heavy hitters when it comes to either filling mason jars or filling the need for a mason.

It's this last skill I want to comment on today. Since laying the concrete block foundation for a 16'x30' house extension our first summer, I've come to enjoy all manner of cementitious construction
(perhaps because it starts with the right letters). Everything from pouring concrete slabs to laying brick hearths; from assembling refractory ovens to decorative tile work.If there's cement involved, I dabble in it.

Last week I spent three days over at Dancing Rabbit, working on Ma'ikwe's cistern (which, auspiciously, begins with C). This project was started in a rush 15 months ago, but got stalled out abruptly when rain precipitated cave-ins after only three days on the job, and before we could get the walls completed. It wasn't just dead in the water—as recently as a month ago it was dead under the water, by virtue of a wet spring. Finally, last week that we had enough dry weather, a stout enough sump pump, and a suitable forecast to go back.

It was time to chip in again and help with the old block work. After having a local backhoe operator re-excavate the hole (I can only shudder at how many hours it would have taken to remove all that clay by hand), we started hauling out all the blocks (about 100) that had not been grouted in place before the collapse, in order to clean off the mud. With a scoop shovel and buckets we removed most of the dirty water that was pooled on the cistern floor. As if packing blocks uphill wasn't challenge enough, you had to be very careful where you stepped because the clay residue made the cistern floor as slicker than bog scum (they don't call clay and water mixtures "slip" for nothing).

Twenty hours later
(spread out over three days), we'd finished laying up the walls (12 courses of 44 blocks each) to within one course of the top and had grouted everything half way. Whew! That was the good news. Unfortunately, it's also July—April of last year is not only a distant memory for its temperamental rain forecasts, it's also a distant memory for its temperate thermometer readings. I mean it's hot in that pit, and my 61-year-old body has been feeling it!

While I arrived at Sandhill as a 24-year-old, I was more of a Young Buck—eager to try anything and with sufficient stamina to handle heavy labor all day long and still joke about it over a beer at the end of the day. Now however, I'm the Old Block that chips have steadily been taken from, and I can't do as much as I used to. Saturday we placed nearly 300 blocks, and at 35 lb a lift, they added up. By 4 pm I was plum tuckered out. After walking home, I was dismayed to discover a heat rash on my ankles from wearing the same socks three days running (the throbbing itch of my ankles was masked by the sunburn on my neck). I was so tired that I couldn't eat solid food at dinner, and settled for several glasses of milk and a bed time slightly ahead of the chickens—after a soothing cold shower and the therapeutic topical application of aloe vera lotion on my neck and ankles. Ahh!

After a couple days off (for Sandhill's regular Sunday meeting, my weekly child care shift, and a cooking day Monday) our cistern crew is back at it today. If all goes well we'll complete the surface bonding of the walls by Thursday, after which it'll be safe to backfill. We'll still have the roof to build (a tricky barrel vault that will be poured in place), but we'll be beyond any danger from cave-ins.

As I type, this Old Block is happy. I can still chip in on construction projects (though my accumulated knowledge is now surely more valuable than my stamina); I still enjoy working with blocks (maybe this goes all the way back to childhood, not just to that first block wall in 1974); and it's gratifying that my body has bounced back from the exhaustion of Saturday afternoon. After two days of yoga, steady hydration, and unfettered air flow on the stressed skin of my ankles and neck, and I'm ready for three more days in the pit. Yeehah!

With any luck, Ma'ikwe will have cold running water this winter—one more of those good things that begin with C.

Friday, April 23, 2010

Bridge Work

As a professional facilitator and conflict worker, a lot of what I do is build bridges between two or more folks having trouble hearing each other. While my life in community didn't start out with this focus it has decidedly become a central part of what I do.

After 36 years of living at Sandhill Farm, my role has gradually evolved from homesteader (there was no end to what things we didn't know how to do when we bravely moved onto the land in the spring of 1974) to community networker (I became my community's delegate to the Federation of Egalitarian Communities in 1979) to nonprofit administrator (I've been the Secretary of the Fellowship for Intentional Community since the late '80s) to facilitation trainer (mainly through a two-year program I pioneered in 2003, where I teach others how to build bridges).

Over the decades, my life has shifted more toward meetings and report writing, and away from milking cows and swinging hammers. While I know why this has happened and don't regret my choices, I haven't lost my enjoyment of more physical tasks, and I've been looking forward for some time to this past week, where I set aside my laptop to honcho building a cistern next to my wife's house at Dancing Rabbit.

Ma'ikwe shares the leasehold of a lot (styled "warrens" in DR argot, to continue the rabbit theme) with her next door neighbors, Bear & Alyssa, and we were all on hand at first light Tuesday morning, when Luke Zimmerman arrived with a backhoe to start excavating the site. Where there had been grass and undisturbed soil at 6 am, there was a 26'x13' hole eight feet deep by 10 am. Ever-conscious of the risk of a cave in (where the digging out would be done by hand), we were poised to work as fast as we could, and were in the hole by 10:05, trying to find the low spots with a transit.

After carefully shaving down the high spots in the clay subsoil, we slapped together 2x6s sufficient to build forms for a 22'x9' slab six inches deep. After leveling and staking the forms, we laid out a lattice of 1/2-inch rebar on two-foot centers, bound every intersection with tie wire, and called for four yards of ready-mix to be delivered from the concrete plant in our county seat, 13 miles away. I had about 30 minutes of down time between the completion of the prep work and before the truck had not arrived—just enough to realize how tired and sore I already was from having worked all day with shovels,
ladders, and hacksaws (to cut the rebar). When the truck rumbled in at about 4:30, there was no time to contemplate how tired we were; it was time to work concrete.

While pouring a 22'x9' slab is relatively straight forward, I knew that this pour would be extra effort. For one thing, we didn't want the truck coming too close to the edge of the hole, where it might precipitate a cave in. That meant we'd have to push the concrete into the corners. For another, concrete is stronger (much stronger) if poured with minimal water and extra cement. Most residential jobs are done with a five bag mix (bags of cement per cubic yard), and contractors regularly allow extra water to be added to enhance workability—even though it results in a marked degradation of the 2500 psi strength that is possible if extra water is not used. I had ordered 3000 psi concrete and had told them up front that I didn't want any extra water. I knew that this was going to be the stiffest concrete anyone in the pit had ever seen.

With the help of neighbors, there were about eight people in the pit: five to push concrete and agitate it in place, two to run a screed board, and one to bull float the finished product. After the floating, we had to place 34 L-bolts at precise locations in the hardening concrete, so that the slab could be tied to the concrete bock walls yet to come. Last, I crawled out on a pair of 2x6s that we laid across the forms and I hand troweled two shallow depressions in the slab to facilitate pumping out the water when we needed to clean the cistern.

When we were finally done, we gently lay a film of polyethylene over the top to retard drying and climbed up the ladders for the last time. It was about 6:15, and beer never tasted any better. When the driver of the concrete truck came over to have us sign the work order, I asked him if he ever made deliveries calling for 3000 psi concrete with no water added. He thought about it for a second, and replied: "It's not common, but we do it for bridges."

Hah, I thought. Even when I try to go back to homesteading, I'm still doing bridge work.